nav opener

You can set a deep link with the following code snippet:

Holidays Switzerland 2080

Here you see the holidays Switzerland for the year 2080. To choose another year, please use the drop-down menu above. The holidays in bold are the public holidays in Switzerland.

January
Mo 01/01/2080
in 20317 days LWE
all
in 20317 days
LWE
Berchtold Day
AG, BE, JU, TG, VD
Tu 01/02/2080
in 20318 days LWE
AG, BE, JU, TG, VD
in 20318 days
LWE
Epiphany
GR, SZ, TI, UR
Sa 01/06/2080
in 20322 days
GR, SZ, TI, UR
in 20322 days
February
We 02/14/2080
in 20361 days
all
in 20361 days
Mo 02/19/2080
in 20366 days
all
in 20366 days
Mo 02/26/2080
in 20373 days
all
in 20373 days
Tu 02/27/2080
in 20374 days
all
in 20374 days
We 02/28/2080
in 20375 days
all
in 20375 days
March
Saint Joseph
GR, LU, NW, SZ, TI, UR, VS, ZG
Tu 03/19/2080
in 20395 days BD
GR, LU, NW, SZ, TI, UR, VS, ZG
in 20395 days
BD
Tu 03/19/2080
in 20395 days
all
in 20395 days
Su 03/31/2080
in 20407 days
all
in 20407 days
April
Th 04/04/2080
in 20411 days LWE
GL
in 20411 days
LWE
Good Friday
AG, AI, BE, BL, BS, FR, GE, GL, GR, JU, LU, NE, NW, OW, SG, SH, SO, SZ, TG, UR, VD, ZG, ZH, AR
Fr 04/05/2080
in 20412 days LWE
AG, AI, BE, BL, BS, FR, GE, GL, GR, JU, LU, NE, NW, OW, SG, SH, SO, SZ, TG, UR, VD, ZG, ZH, AR
in 20412 days
LWE
Su 04/07/2080
in 20414 days
all
in 20414 days
Mo 04/08/2080
in 20415 days LWE
in 20415 days
LWE
Mo 04/15/2080
in 20422 days LWE
ZH
in 20422 days
LWE
May
Labour Day
AG, BL, BS, FR, JU, NE, SH, SO, TG, TI, ZH
We 05/01/2080
in 20438 days
AG, BL, BS, FR, JU, NE, SH, SO, TG, TI, ZH
in 20438 days
Su 05/12/2080
in 20449 days
all
in 20449 days
Th 05/16/2080
in 20453 days BD
all
in 20453 days
BD
Su 05/26/2080
in 20463 days
all
in 20463 days
Whit Monday
AG, AI, BE, BL, BS, GE, GL, GR, JU, LU, SG, SH, SO, SZ, TG, TI, UR, VD, ZH, AR
Mo 05/27/2080
in 20464 days LWE
AG, AI, BE, BL, BS, GE, GL, GR, JU, LU, SG, SH, SO, SZ, TG, TI, UR, VD, ZH, AR
in 20464 days
LWE
June
Corpus Christi
AG, AI, FR, GR, JU, LU, NE, NW, OW, SO, SZ, TI, UR, VS, ZG
Th 06/06/2080
in 20474 days BD
AG, AI, FR, GR, JU, LU, NE, NW, OW, SO, SZ, TI, UR, VS, ZG
in 20474 days
BD
Th 06/20/2080
in 20488 days
all
in 20488 days
Sa 06/29/2080
in 20497 days
GR, LU, TI
in 20497 days
August
Th 08/01/2080
in 20530 days BD
all
in 20530 days
BD
Assumption Day
AG, AI, FR, GR, NW, OW, SO, SZ, TI, UR, ZG
Th 08/15/2080
in 20544 days BD
AG, AI, FR, GR, NW, OW, SO, SZ, TI, UR, ZG
in 20544 days
BD
September
Mo 09/09/2080
in 20569 days LWE
ZH
in 20569 days
LWE
Swiss Federal Fast
AG, AI, BE, BL, BS, FR, GL, GR, JU, LU, NE, NW, OW, SG, SH, SO, SZ, TG, TI, UR, VD, VS, ZG, ZH, AR
Su 09/15/2080
in 20575 days
AG, AI, BE, BL, BS, FR, GL, GR, JU, LU, NE, NW, OW, SG, SH, SO, SZ, TG, TI, UR, VD, VS, ZG, ZH, AR
in 20575 days
Su 09/22/2080
in 20582 days
all
in 20582 days
October
Su 10/27/2080
in 20617 days
all
in 20617 days
November
All Saints' Day
AG, AI, FR, GL, GR, JU, LU, NW, OW, SG, SO, SZ, TI, UR, VS, ZG
Fr 11/01/2080
in 20622 days LWE
AG, AI, FR, GL, GR, JU, LU, NW, OW, SG, SO, SZ, TI, UR, VS, ZG
in 20622 days
LWE
Sa 11/02/2080
in 20623 days
all
in 20623 days
Su 11/24/2080
in 20645 days
all
in 20645 days
December
Feast of the Immaculate Conception
AG, AI, FR, GR, LU, NW, OW, SO, SZ, TI, UR, VS, ZG
Su 12/08/2080
in 20659 days
AG, AI, FR, GR, LU, NW, OW, SO, SZ, TI, UR, VS, ZG
in 20659 days
Fr 12/20/2080
in 20671 days
all
in 20671 days
Tu 12/24/2080
in 20675 days
all
in 20675 days
We 12/25/2080
in 20676 days
all
in 20676 days
St. Stephen's Day
AG, AI, BE, BL, BS, GL, GR, LU, SG, SH, SO, SZ, TG, TI, UR, ZH, AR
Th 12/26/2080
in 20677 days BD
AG, AI, BE, BL, BS, GL, GR, LU, SG, SH, SO, SZ, TG, TI, UR, ZH, AR
in 20677 days
BD
Tu 12/31/2080
in 20682 days
all
in 20682 days

Abbreviations

  • LWE: possible long weekend
  • BD: possible bridge day

You can set a deep link with the following code snippet: